Transport, truck, 16 to 28t, fleet average {AU}| | AusLCI, U
Unit process Australia v00.00.000
Included processes:Transport road and vehicle infrastructure vehicle operation including allowance for backhaul. Remark: Inventory is based on freight task which is the combined impacts of a freight movement based on measurement of the net distance multiplied by the net mass moved. Average load (28t) with backhaul of 1.2 (truck is empty 40% of the time). Inventory is an average of urban and rural transport. Geography: Refers to an average production in the Australia. Technology: Average Time period: Data collected for 2012 Version: 1.0 Record: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU Generator: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU
- Sector
- Transport
- Contributor
- —
- Last updated
- 30 Dec 1899
- Reference ID
10be8e79-41fd-30c6-8d02-3a06b2790af8
Download this dataset Ask a question about this dataset
Downloads require a free account. You'll be asked to register or sign in.
Documentation
- Quantitative reference
- Transport, truck, 16 to 28t, fleet average {AU}| | AusLCI, U
- Sampling procedure
- —
- Creation date
- 30 Dec 1899
- Is copyright protected
- No
- Is infrastructure process
- No
- Tags
- transport
- Sources
-
Australian Transport Facts 2011, Data tables./2011/Adam Pekol Consulting Pty Ltd
Product outputs
| Flow | Amount | Unit | Comment |
|---|---|---|---|
| Transport, truck, 16 to 28t, fleet average {AU}| | AusLCI, U | 1.0 | t*km | — |
Technical inputs
| Flow | Amount | Unit | Comment |
|---|---|---|---|
| Lorry, 16 metric ton {RoW}| market for lorry, 16 metric ton | Cut-off, U | 0.000000321 | Item(s) | (3,1,1,2,1,na); from ecoinvent |
| Maintenance, lorry 16 metric ton {RoW}| market for maintenance, lorry 16 metric ton | Cut-off, U | 0.000000321 | Item(s) | (3,1,1,2,1,na); from ecoinvent |
| Operation, truck 16 to 28t, fleet average {AU}| | AusLCI, U | 0.07575757575757576 | km | Adam Pekol Consulting 2011 |
| Road maintenance {RoW}| market for road maintenance | Cut-off, U | 0.00020331 | m*a | (3,1,1,1,1,na);from ecoinvent |
| Road {GLO}| market for road | Cut-off, U | 0.0012955 | m*a | (3,1,1,1,1,na);from ecoinvent |
Parameters
| Name | Value | Formula | Description |
|---|---|---|---|
| Average_Load | 22.0 | — | Midpoint in range. |
| Fr_Truck_loaded | 0.6 | — | Fraction of time in which the truck is loaded |