Electricity, high voltage {AU}| market for electricity, high voltage | AusLCI, U

Unit process Australia v00.00.000

Remark: Trasmission of electricity including transmission losses. Geography:Australia. Technology: Current Version: 1.0 Included processes start:Process begins withthe delivery of generated power at the power station into the transmission network IIncluded processes end: Process ends with the delivery ofhigh voltage power to users or distribution networkV Excluded processes:Heat emissions not included. Start date:2011-07-0 End date:2102-06-30 is data valid for entire period: false Record: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU Generator: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU

Sector
Energy
Contributor
—
Last updated
07 Apr 2013
Reference ID
2b713d1a-4ab5-39a6-bc11-f58f627b1af9

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Electricity, high voltage {AU}| market for electricity, high voltage | AusLCI, U
Sampling procedure
—
Creation date
07 Apr 2013
Is copyright protected
No
Is infrastructure process
No
Tags
energy
Sources
Energy Gas Australia 2018/2018/Australian Energy Council.
Energy in Australia 2011/2011/ABARE

Product outputs

Flow AmountUnitComment
Electricity, high voltage {AU}| market for electricity, high voltage | AusLCI, U 1.0 kWh An inventory for electricity produced from Black Liquor is missing

Technical inputs

Flow AmountUnitComment
Electricity, at powerplant {AU}| electricity production mix | AusLCI, U 1.0400416016640666 kWh —
Transmission network, electricity, high voltage {GLO}| market for transmission network, electricity, high voltage | Cut-off, U 0.00000000844 km approximation with Swiss data
Transmission network, long-distance {GLO}| market for transmission network, long-distance | Cut-off, U 0.000000000317 km approximation with data from Europe

Elementary flow inputs

Flow Sub-compartment AmountUnitComment
Occupation, urban, green areas — 0.04 m2*a —

Elementary flow outputs

Flow CompartmentSub-compartment AmountUnitComment
Dinitrogen monoxide Emission to airlow population density 0.000005 kg approximation with Swiss data
Energy losses in electricty transmission Non material emissions— 0.0385 kWh —
Ozone Emission to airlow population density 0.0000045 kg approximation with Swiss data

Parameters

NameValueFormulaDescription
E_Total_Aus 229000.0 — (1,1,1,1,1,na)[GWh] Total Electricity production in Australia in 2008
Width 20.0 — (5,5,5,5,na,na)[m] Estimated Width occupied by the power line NOT CHANGED
Transmission_Loss 0.0385 — Based on AEMO NEM Marginal Loss Factors report FY22-23 and EGA Appendix 1 Principal Power stations in Australia 2022-23
Occupation_m2a 0.04 (TL_Total_Aus*Width)/E_Total_Aus/1000000 [m2a] Average area occupied for transmission per GWh/100000 to get to kWhs
TL_Total_Aus 458000000.0 — (1,1,1,1,1,na)[m] Total length of transmission lines, overhead lines and underground cables (from 500kV to 11kV) in Australia
NGAF_Adjust 0.7 — Factor used to adjust NGAF