Electricity, high voltage {AU}| market for electricity, high voltage | AusLCI, U
Unit process Australia v00.00.000
Remark: Trasmission of electricity including transmission losses. Geography:Australia. Technology: Current Version: 1.0 Included processes start:Process begins withthe delivery of generated power at the power station into the transmission network IIncluded processes end: Process ends with the delivery ofhigh voltage power to users or distribution networkV Excluded processes:Heat emissions not included. Start date:2011-07-0 End date:2102-06-30 is data valid for entire period: false Record: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU Generator: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU
- Sector
- Energy
- Contributor
- —
- Last updated
- 07 Apr 2013
- Reference ID
2b713d1a-4ab5-39a6-bc11-f58f627b1af9
Download this dataset Ask a question about this dataset
Downloads require a free account. You'll be asked to register or sign in.
Documentation
- Quantitative reference
- Electricity, high voltage {AU}| market for electricity, high voltage | AusLCI, U
- Sampling procedure
- —
- Creation date
- 07 Apr 2013
- Is copyright protected
- No
- Is infrastructure process
- No
- Tags
- energy
- Sources
-
Energy Gas Australia 2018/2018/Australian Energy Council.
Energy in Australia 2011/2011/ABARE
Product outputs
| Flow | Amount | Unit | Comment |
|---|---|---|---|
| Electricity, high voltage {AU}| market for electricity, high voltage | AusLCI, U | 1.0 | kWh | An inventory for electricity produced from Black Liquor is missing |
Technical inputs
| Flow | Amount | Unit | Comment |
|---|---|---|---|
| Electricity, at powerplant {AU}| electricity production mix | AusLCI, U | 1.0400416016640666 | kWh | — |
| Transmission network, electricity, high voltage {GLO}| market for transmission network, electricity, high voltage | Cut-off, U | 0.00000000844 | km | approximation with Swiss data |
| Transmission network, long-distance {GLO}| market for transmission network, long-distance | Cut-off, U | 0.000000000317 | km | approximation with data from Europe |
Elementary flow inputs
| Flow | Sub-compartment | Amount | Unit | Comment |
|---|---|---|---|---|
| Occupation, urban, green areas | — | 0.04 | m2*a | — |
Elementary flow outputs
| Flow | Compartment | Sub-compartment | Amount | Unit | Comment |
|---|---|---|---|---|---|
| Dinitrogen monoxide | Emission to air | low population density | 0.000005 | kg | approximation with Swiss data |
| Energy losses in electricty transmission | Non material emissions | — | 0.0385 | kWh | — |
| Ozone | Emission to air | low population density | 0.0000045 | kg | approximation with Swiss data |
Parameters
| Name | Value | Formula | Description |
|---|---|---|---|
| E_Total_Aus | 229000.0 | — | (1,1,1,1,1,na)[GWh] Total Electricity production in Australia in 2008 |
| Width | 20.0 | — | (5,5,5,5,na,na)[m] Estimated Width occupied by the power line NOT CHANGED |
| Transmission_Loss | 0.0385 | — | Based on AEMO NEM Marginal Loss Factors report FY22-23 and EGA Appendix 1 Principal Power stations in Australia 2022-23 |
| Occupation_m2a | 0.04 | (TL_Total_Aus*Width)/E_Total_Aus/1000000 | [m2a] Average area occupied for transmission per GWh/100000 to get to kWhs |
| TL_Total_Aus | 458000000.0 | — | (1,1,1,1,1,na)[m] Total length of transmission lines, overhead lines and underground cables (from 500kV to 11kV) in Australia |
| NGAF_Adjust | 0.7 | — | Factor used to adjust NGAF |