Transport, truck, 16 to 28t with 11t load {AU}| | AusLCI, U

Unit process Australia v00.00.000

Included processes:Transport road and vehicle infrastructure vehicle operation including allowance for backhaul. Remark: Inventory is based on freight task which is the combined impacts of a freight movement based on measurement of the net distance multiplied by the net mass moved. Average load (28t) with backhaul of 1.2 (truck is empty 40% of the time). Inventory is an average of urban and rural transport. Geography: Refers to an average production in the Australia. Technology: Average Time period: Data collected for 2012 Version: 1.0 Record: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU Generator: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU

Sector
Transport
Contributor
—
Last updated
30 Dec 2013
Reference ID
4e4352c6-5b1e-33b9-84ef-a9e5816e8fa5

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Transport, truck, 16 to 28t with 11t load {AU}| | AusLCI, U
Sampling procedure
—
Creation date
30 Dec 2013
Is copyright protected
No
Is infrastructure process
No
Tags
transport
Sources
Australian Transport Facts 2011, Data tables./2011/Adam Pekol Consulting Pty Ltd

Product outputs

Flow AmountUnitComment
Transport, truck, 16 to 28t with 11t load {AU}| | AusLCI, U 1.0 t*km —

Technical inputs

Flow AmountUnitComment
Lorry, 16 metric ton {RoW}| market for lorry, 16 metric ton | Cut-off, U 0.000000321 Item(s) (3,1,1,2,1,na); from ecoinvent
Maintenance, lorry 16 metric ton {RoW}| market for maintenance, lorry 16 metric ton | Cut-off, U 0.000000321 Item(s) (3,1,1,2,1,na); from ecoinvent
Operation, truck 16 to 28t, fleet average {AU}| | AusLCI, U 0.15151515151515152 km Adam Pekol Consulting 2011
Road maintenance {RoW}| market for road maintenance | Cut-off, U 0.00020331 m*a (3,1,1,1,1,na);from ecoinvent
Road {GLO}| market for road | Cut-off, U 0.0012955 m*a (3,1,1,1,1,na);from ecoinvent

Parameters

NameValueFormulaDescription
Fr_Truck_loaded 0.6 — Fraction of time in which the truck is loaded
Average_Load 11.0 — Midpoint in range.