Transport, freight, rail {AU}| | AusLCI, U

Unit process Australia v00.00.000

Included processes:rail infrastructure and rolling stock and the energy input and emissions from rail operations. Remark: Processes were average railfreight in Australia Geography: Refers to an average production in the Australia. Technology: Average Time period: Data collected for 2009 Version: 1.0 Record: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU Generator: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU

Sector
Transport
Contributor
—
Last updated
30 Dec 1899
Reference ID
645e59b3-7f97-3e9a-83dd-cf3e5ddb73ea

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Transport, freight, rail {AU}| | AusLCI, U
Sampling procedure
—
Creation date
30 Dec 1899
Is copyright protected
No
Is infrastructure process
No
Tags
transport
Sources
Australian Transport Facts 2011, Data tables./2011/Adam Pekol Consulting Pty Ltd

Product outputs

Flow AmountUnitComment
Transport, freight, rail {AU}| | AusLCI, U 1.0 t*km —

Technical inputs

Flow AmountUnitComment
Goods wagon {GLO}| market for goods wagon | Cut-off, U 0.0000000459 Item(s) own estimation based on comparison with the vehicle stock-transport performance ratio in 1999 and further geographical uncertainties due to extrapolation
Locomotive {GLO}| market for locomotive | Cut-off, U 0.000000000711 Item(s) own estimation based on comparison with the vehicle stock-transport performance ratio in 1999 and further geographical uncertainties due to extrapolation
Maintenance, goods wagon {GLO}| market for maintenance, goods wagon | Cut-off, U 0.0000000459 Item(s) own estimation based on comparison with the vehicle stock-transport performance ratio in 1999 and further geographical uncertainties due to extrapolation
Maintenance, locomotive {GLO}| market for maintenance, locomotive | Cut-off, U 0.000000000711 Item(s) own estimation based on comparison with the vehicle stock-transport performance ratio in 1999 and further geographical uncertainties due to extrapolation
Operation, freight train {AU}| | AusLCI, U 1.0 t*km —
Railway track {GLO}| market for railway track | Cut-off, U 0.000093 m*a (3,1,1,3,1,na); own estimation taken into account uncertainties in the infrastructure legth -transport performance ratio and further geographical uncertainties due to extrapolation

Elementary flow inputs

Flow Sub-compartment AmountUnitComment
Occupation, traffic area land 0.0048 m2*a —

Elementary flow outputs

Flow CompartmentSub-compartment AmountUnitComment
Transport energy Non material emissions— 0.26 MJ —