Electricity, at heat pump 30kW, allocation electricity/CH U/adapted {AU}| | AusLCI, U

Unit process Australia v00.00.000

Heat process adapted to electricity using 40% efficiency factor Record: Data entry by: Thomas Heck Telephone: 0041 56 310 2651; E-mail: psi@ecoinvent.org; Company: PSI; Country: CH Generator: Generator/publicator: Thomas Heck Telephone: 0041 56 310 2651; E-mail: psi@ecoinvent.org; Company: PSI; Country: CH

Sector
Energy
Contributor
—
Last updated
04 Jul 2013
Reference ID
ba54ad3e-0fc2-358d-8ba6-e45c15a06743

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Electricity, at heat pump 30kW, allocation electricity/CH U/adapted {AU}| | AusLCI, U
Sampling procedure
Sampling procedure: Literature, manufacturer information
Creation date
04 Jul 2013
Is copyright protected
No
Is infrastructure process
No
Tags
energy
Sources
Wärme-Kraft-Kopplung/2007/Heck, T.

Product outputs

Flow AmountUnitComment
Electricity, at heat pump 30kW, allocation electricity/CH U/adapted {AU}| | AusLCI, U 0.4 MJ SWITZERLAND

Technical inputs

Flow AmountUnitComment
Heat pump, 30kW {GLO}| market for heat pump, 30kW | Cut-off, U 0.0000000347 Item(s) uncertainty of life time
Heat, central or small-scale, natural gas, Jakobsberg {RoW}| heat and power co-generation, natural gas, 160kW electrical, Jakobsberg | Cut-off, U 0.0617 kWh Seasonal Performance Factor, data from operators; uncertainty from range of Coefficient of Performance.

Elementary flow outputs

Flow CompartmentSub-compartment AmountUnitComment
1,1,1,2-Tetrafluoroethane Emission to airhigh population density 0.000000393 kg estimated from range of values in literature
Heat, waste Emission to airhigh population density 0.222 MJ equals electricity input