Railway track, cane transport {AU}| | AusLCI, U

Unit process Australia v00.00.000

Included processes:Data includes infrastructure provision for the cane railway. The maintenance of tracks is not included. Remark: This inventory has been developed as part of the AusAgLCI initiative funded by a partnership of Australian Research and Development Corporations (RIRDC, CRDC, GRDC, SRDC, HAL, MLA, DA, FWPA) and Research Agencies (CSIRO, USQ and Q DAFF), with technical support from Life Cycle Strategies. More detail on inventory development can be found in the 'AusAgLCI Methodology for developing Life Cycle Inventory' documents located at www.auslci.alcas.asn.au. Geography: Refers to an average production in the Australia. Technology: Average Time period: Data collected for 2012 Version: 1.0 Record: Data entry by: Tim Grant Telephone: 0061 408104977; E_mail: tim@lifecycles.com.au; Company: LCS; Country: AU Generator: Generator/publicator: Marguerite Renouf, Telephone:; E_mail: m.renouf@uq.edu.au; Company: The University of Queensland; Country: AU

Sector
Transport
Contributor
—
Last updated
07 Jun 2007
Reference ID
da0bf16c-f18f-3cdd-bf92-8735ac580fc5

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Railway track, cane transport {AU}| | AusLCI, U
Sampling procedure
Data for cane rail infrastructure based on primary data collected from the Light Rail Research Society of Australia.
Creation date
07 Jun 2007
Is copyright protected
No
Is infrastructure process
No
Tags
transport
Sources
Independent assessment of the sugar industry. /2002/C. Hildebrand

Product outputs

Flow AmountUnitComment
Railway track, cane transport {AU}| | AusLCI, U 30000000.0 m*a —

Technical inputs

Flow AmountUnitComment
Concrete 25 MPa, at batching plant {AU}| | AusLCI, U 35250.0 m3 Estimate of the concrete in railway sleepers, based on data from the Light Railway Research Society of Australia (Browing 2007). SD^2 derived from (2,2,1,1,1,3,3.0)
Gravel, crushed {RoW}| market for gravel, crushed | Cut-off, U 977000000.0 kg Estimate of gravel for ballast, based on data from the Light Railway Research Society of Australia (Browing 2007 SD^2 derived from (2,2,1,1,1,3,3.0)
Sawnwood, board, hardwood, dried (u=10%), planed {GLO}| market for sawnwood, board, hardwood, dried (u=10%), planed | Cut-off, U 4350.0 m3 Estimate of the timber in railway sleepers, based on data from the Light Railway Research Society of Australia (Browing 2007). SD^2 derived from (2,2,1,1,1,3,3.0)
Steel, low-alloyed {GLO}| market for steel, low-alloyed | Cut-off, U 33978.0 t Estimate of the steel contained in the tracks, based on data from the Light Railway Research Society of Australia (Browing 2007). SD^2 derived from (2,2,1,1,1,3,3.0)

Parameters

NameValueFormulaDescription
d_hardwood 1000.0 — kg/m3
d_concrete 2400.0 — kg/m3 density of concrete m^3