Transport, truck, 3,5 to 16t with 12t load {AU}| | AusLCI, U
Unit process Australia v00.00.000
Included processes:Transport road and vehicle infrastructure vehicle operation including allowance for backhaul. Remark:Inventory is based on freight task which is the combined impacts of a freight movement based on measurement of the net distance multiplied by the net mass moved. Geography: Refers to an average production in the Australia. Technology: Average Time period: Data collected for 2012 Version: 1.0 Record: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU Generator: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU
- Sector
- Transport
- Contributor
- —
- Last updated
- 30 Dec 1899
- Reference ID
e3011759-06e1-32a7-9a2c-597770fde17e
Download this dataset Ask a question about this dataset
Downloads require a free account. You'll be asked to register or sign in.
Documentation
- Quantitative reference
- Transport, truck, 3,5 to 16t with 12t load {AU}| | AusLCI, U
- Sampling procedure
- —
- Creation date
- 30 Dec 1899
- Is copyright protected
- No
- Is infrastructure process
- No
- Tags
- transport
- Sources
-
Australian Transport Facts 2011, Data tables./2011/Adam Pekol Consulting Pty Ltd
Product outputs
| Flow | Amount | Unit | Comment |
|---|---|---|---|
| Transport, truck, 3,5 to 16t with 12t load {AU}| | AusLCI, U | 1.0 | t*km | — |
Technical inputs
| Flow | Amount | Unit | Comment |
|---|---|---|---|
| Lorry, 16 metric ton {RoW}| market for lorry, 16 metric ton | Cut-off, U | 0.00000189 | Item(s) | (3,1,1,2,1,na); from ecoinvent |
| Maintenance, lorry 16 metric ton {RoW}| market for maintenance, lorry 16 metric ton | Cut-off, U | 0.00000189 | Item(s) | (3,1,1,2,1,na); from ecoinvent |
| Operation, truck 3,5 to 16t, fleet average {AU}| | AusLCI, U | 0.1478852410529429 | km | Specify amount of rural/city in process parameters, not here. |
| Road maintenance {RoW}| market for road maintenance | Cut-off, U | 0.0011962 | m*a | (3,1,1,2,1,na); from ecoinvent |
| Road {GLO}| market for road | Cut-off, U | 0.0028866 | m*a | (3,1,1,2,1,na); from ecoinvent |
Elementary flow outputs
| Flow | Compartment | Sub-compartment | Amount | Unit | Comment |
|---|---|---|---|---|---|
| Truck travel distance, urban | Non material emissions | — | 0.2 | km | — |
Parameters
| Name | Value | Formula | Description |
|---|---|---|---|
| Fr_Truck_loaded | 0.5635 | — | Fraction of time in which the truck is loaded |
| Average_Load | 12.0 | — | Midpoint in range. |