Electricity mix, 2050 Queensland {AU}|_Obsolete | AusLCI, U

Unit process Australia v00.00.000

QLD electricity mix data was inputted into Excel. Gap identified at 2050 by adding up all non-renewable energy sources at 2020. Functions in excel were used to calculate the difference per year for solar, the only scaling renewable in QLD to increase linearly to 2050 estimates (and levelling off to 2080) and for non-renewable sources to decrease constantly to 0 by 2050. Non-scaling renewables were kept constant from 2020 to 2080. Average determined for 2050 and for 2080, values used in parameters within electricity mix 2050 QLD and electricity mix 2080 QLD processes.

Sector
Energy
Contributor
—
Last updated
30 Dec 1899
Reference ID
e9a2b625-74d2-351b-9a0a-e0a118bbdb33

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Electricity mix, 2050 Queensland {AU}|_Obsolete | AusLCI, U
Sampling procedure
—
Creation date
30 Dec 1899
Is copyright protected
No
Is infrastructure process
No
Tags
energy
Sources
Energy Gas Australia 2018/2018/Australian Energy Council.
Energy in Australia 2011/2011/ABARE
State of the energy market 2009/2009/Australian Energy Regulator

Product outputs

Flow AmountUnitComment
Electricity mix, 2050 Queensland {AU}|_Obsolete | AusLCI, U 1.0 kWh —

Technical inputs

Flow AmountUnitComment
Electricity, at heat pump 30kW, allocation electricity/CH U/adapted {AU}| | AusLCI, U 0.004229909040149953 kWh —
Electricity, black coal QLD, at power plant {AU}| | AusLCI, U 0.4049714853022102 kWh —
Electricity, coal seam methane, at power plant {AU}| | AusLCI, U 0.010708138833674004 kWh —
Electricity, coal seam methane, at power plant {AU}| | AusLCI, U 0.004373746847400208 kWh —
Electricity, high voltage {AU}| electricity production, oil | Cut-off, U 0.0005943309230952695 kWh —
Electricity, high voltage {AU}| heat and power co-generation, biogas, gas engine | Cut-off, U 0.002099036704476518 kWh —
Electricity, high voltage {AU}| heat and power co-generation, biogas, gas engine | Cut-off, U 0.00008434375018404268 kWh —
Electricity, high voltage {CO}| treatment of bagasse, from sugarcane, in heat and power co-generation unit, 6400kW thermal | Cut-off, U 0.011969020588428522 kWh —
Electricity, high voltage {CO}| treatment of bagasse, from sugarcane, in heat and power co-generation unit, 6400kW thermal | Cut-off, U 0.00044768657596744977 kWh —
Electricity, high voltage {RoW}| electricity production, hydro, reservoir, non-alpine region | Cut-off, U 0.01034455205663276 kWh —
Electricity, low voltage {AU}| electricity production, photovoltaic, 3kWp slanted-roof installation, multi-Si, panel, mounted | Cut-off, U 0.49642830825211576 kWh —
Electricity, natural gas, CC, at power plant {AU}| | AusLCI, U 0.038351330462932674 kWh —
Electricity, natural gas, GT, at power plant {AU}| | AusLCI, U 0.015398110662732604 kWh —

Parameters

NameValueFormulaDescription
E_Total_Aus 230374.0 — [GWh] Total Electricity production in Australia in 2010 - ESAA 2011 table 2.5
E_HeatPump 266.0 — [GWh] Total production of electricity from Heat pump in QLD in 2017. EGA Australia 2018 Table 2.11-12 equates to 0.4% of supply, 2017 value used for 2050 calculations, remains constant.
E_Total_QLD 62885.5130158 RE_Total_QLD+NRE_Total_QLD [GWh] Total production of electricity in Queensland in 2008
TL_Total_Aus 458000000.0 — [m] Total length of transmission lines, overhead lines and underground cables (from 500kV to 11kV) in Australia
E_Biomass 28.153 — [GWh] Total production of electricity from Biomass in QLD in 2017. EGA Australia 2018 Table 2.11-12 equates to 0% of supply, 2017 value used for 2050 calculations, remains constant.
E_GCombined 2411.743091 — [GWh] Total production of electricity from Combined cycle in QLD in 2017. EGA Australia 2018 Table 2.5 equates to 4.2% of supply, Percent of electricity mix goes to 0 by 2050, linear model used to calculate value.
NRE_Total_QLD 29832.707712800002 E_BlackCoal+E_Oil+E_GTurbine+E_Gcombined+E_CSMGT+E_CSMCC [GWh] Total production of electricity from non-renewable resources in Queensland in 2008
E_BlackCoal 25466.83961 — [GWh] Total production of electricity from Black coal in QLD in 2017. EGA Australia 2018 Table 2.6 equates to 74.1% of supply, Percent of electricity mix goes to 0 by 2050, linear model used to calculate value.
E_GTurbine 968.3180885 — [GWh] Total production of electricity from Gas turbine in QLD in 2017. EGA Australia 2018 Table 2.5 equates to 0% of supply, Percent of electricity mix goes to 0 by 2050, linear model used to calculate value.
E_SGas 5.304 — [GWh] Total production of electricity from Sewage gas in QLD in 2017. EGA Australia 2018 Table 2.11-12 equates to 0% of supply, Value is calculated by percentage of gap for renewable sources for 2050 and linear model used to calculate 2050 value.
E_Solar 31218.14884 — [GWh] Total production of electricity from Solar in QLD in 2017. Department of the Environment and Energy, Australian Energy Statistics, Table O, August 2018
RE_Total_QLD 33052.805303 E_Hydro+E_Biomass+E_Bagasse+E_heatpump+E_Lgas+E_SGas+E_solar [GWh] Total production of electricity from renewable resources in Queensland in 2008
E_CSMGT 275.0453143 — [GWh] Total production of electricity from CSM GT in Australia in 2017. EGA Australia 2018 able 2.6 equates to 7.2% of supply, Percent of electricity mix goes to 0 by 2050, linear model used to calculate value.
E_Hydro 650.522463 — [GWh] Total production of electricity from Hydro in QLD in 2017. EGA Australia 2018 Table 2.6 equates to 1.5% of supply, 2017 value used for 2050 calculations, remains constant.
E_Oil 37.374805 — [GWh] Total production of electricity from Oil products in QLD in 2017. EGA Australia 2018 Table 2.6 equates to 0% of supply, Percent of electricity mix goes to 0 by 2050, linear model used to calculate value.
E_CSMCC 673.386804 — [GWh] Total production of electricity from CSM CC in Australia in 2017. EGA Australia 2018 Table 2.6 equates to 8.6% of supply, Percent of electricity mix goes to 0 by 2050, linear model used to calculate value.
E_Bagasse 752.678 — [GWh] Total production of electricity from Bagasse in QLD in 2017. EGA Australia 2018 Table 2.11-12 equates to 0.8% of supply, 2017 value used for 2050 calculations, remains constant.
E_Lgas 131.999 — [GWh] Total production of electricity from Landfill gas in QLD in 2017. EGA Australia 2018 Table 2.11-12 equates to 0.1% of supply, 2017 value used for 2050 calculations, remains constant.